Strategija i instrumenti za investiranje u nova postrojenja; dijagnostika stanja opreme i preostali radni vek, dijagnostika procesa, planiranje, realizacija i analiza revitalizacionih zahvata, unapređenja na mašinskoj i elektroopremi.
Radovi odabrani za sesiju Konferencije pod nazivom: PRODUŽAVANJE RADNOG VEKA POSTOJEĆIH ELEKTRANA I SISTEMA - MOGUĆNOSTI I IZAZOVI
Dragan Vlaisavljević (Public enterprise "Electric Power Industry of Serbia")
Abstrakt
In the next 30-40 years, the electricity sector of Serbia will undergo a transformation in order to meet the climate requirements set for Serbia.
The electric power sector of Serbia, as well as the largest producer of electricity in Serbia, and that is PE EPS, should realize the so-called Green transition in order to achieve the climate goals set for Serbia.
The development of the strategy as well as the implementation of this strategy in order to achieve a green transition is associated with many challenges, risks and errors both in planning and during the implementation of this strategy.
The basic concepts of the green transition expressed in different scenarios should be analyzed and the possible weaknesses of individual scenarios should be pointed out, as well as the required time frames, costs and impacts on customers and producers of electricity in Serbia.
Takanori Nakamoto, Hiroyuki Nosaka, Takashi Muramoto, Taukro Ueda (Mitsubishi Heavy Industries, Ltd., 6-9 Takara-machi, Kure-shi, Hiroshima-ken, 737-8508 Japan)
Tsuyoshi Aihara, Hideto Kawata, Jun Hashimoto (Mitsubishi Heavy Industries, Ltd., 3-3-1 Minatomirai, Nishi-ku, Yokohama, 220-8401, Japan)
Abstrakt
There is a growing need for Air Quality Control System (AQCS) under the situation that regulation on emission has become more stringent all over the world. To meet the world lowest level regulation in thermal power plants, Selective Catalytic Reactor (SCR), Electrostatic Precipitator (ESP) and Flue Gas Desulphurization (FGD) is the key components. In addition, reduction of CO2 emission is demanded considering global warming. Not only each equipment performance but system integration as total AQCS is important. In this paper, Mitsubishi Power, Ltd.(MPW) introduces state-of-the-art MPW’s AQCS technology, and on-going Current Major AQCS Projects in Serbia – TENT A FGD and TENT B FGD and completed project in the Region – Ugljevik FGD that contribute to Environment Protection with a great deal. Also MPW makes introduction of CCS technology, one of new technologies for the future.
Milan V Petrovic, Srdjan Milic, Milan B Banjac, Djordje Petkovic, Teodora Madžar (University of Belgrade – Faculty of Mechanical Engineering)
Luka Petrovic, Borivoje Vujicic, Zarko Novakovic (Elektroprivreda of Republika Srpska)
Abstrakt
The Ugljevik thermal power plant (ТPP), with a capacity of 300 MW, has been in operation since 1985. The TPP now works with significant problems, especially with the boiler, which has a reduced degree of efficiency and an increased flue gas temperature at the outlet. Therefore, high-pressure heaters must be switched off in the plant, which reduces the efficiency of the turbo plant, and the power (to about 275 MW) that can be achieved is significantly lower than the nominal one. After 200,000 operating hours, the turbo plant works with deteriorating operating characteristics and, to a significant extent, the spent useful operating life of vital turbine components due to a large number of operating hours and starts. To continue safe operation, a capital overhaul with an extension of the operating life for the next 150,000 hours is planned. In this paper, the feasibility of additional investments in the modernization of the turbine plant is considered. The modernization implies the improvement of the degree of efficiency and the increase of the electric power of the unit.
Prof Gordana Bakić, PhD, dipl.eng.mech. (University of Belgrade, Mechanical Engineering Faculty)
Vesna Perunicic, dipl.eng.matalurgy (Technical Center Inspect, Obrenovac)
Ivan Gajić, dipl.eng.mech. (Via Ocel d.o.o., Belgrade)
Savo Bezmarević, dipl.eng.mech. (Electric Power Industry of Serbia)
Prof Miloš Đukić1, PhD, dipl.eng.mech. (University of Belgrade, Mechanical Engineering Faculty)
Bratislav Rajičić, dipl.eng.mech., Aleksandar Maslarević, PhD, dipl.eng.mech. (University of Belgrade, Innovation Center of the Mechanical Engineering Faculty)
Abstrakt
Procurement of highly valuable parts of thermal power plants, such as fresh steam pipeline components that
are exposed to the highest operating parameters during the operation of the plant, implies defining very precise
requirements for the delivery of equipment parts. When there are precise requirements for the finished product,
the producers need to obtained strictly control of the production parameters. The importance of each of the
requirements is often oversighted by technical persons, both those who procure and those who supply
equipment, especially if the requirements are not contained in the standards, but derive from knowledge that
is the domain of narrowly specialized scientific fields. In this paper, the importance of both input control and
compliance with each of the technical requirements is shown on the example of fresh steam steam pipe
components made of X10CrMoVNb91 steel that are delivered with inhomogeneous and in some parts reduced
properties. Also, a solution was offered on what to do with such equipment and it was assessed how long it
could work safely with lower properties.
________________________________________________
Nabavka visoko vrednih delova termoenergetskih postrojenja, kao što su komponente parovoda sveže pare koje su izložene najvišim radnim parametrima tokom rada postrojenja, podrazumeva definisanje vrlo preciznih zahteva za isporuku delova opreme. Kada postoje precizni zahtevi za gotov proizvod, ispručioci moraju strogo da kontrolišu parametre proizvodnje delova. Značaj svakog od zahteva često promiče tehničkim licima, i onima koji nabavljaju i onima koji isporučuju opremu, posebno ako zahtevi nisu sadržani u standardima, već proističu iz saznanja koja su domen usko specijalizovanih naučnih oblasti. U ovom radu je na primeru komponenti parovoda sveže pare izrađenih od čelika X10CrMoVNb91 koje su isporučene sa nehomogenim i u nekom delu sniženim osobinama prikazan značaj kako ulazne kontrole, tako i poštovanja svakog od tehničkih zahteva. Takođe, ponuđeno je i rešenje šta raditi sa takvom opremom i ocenjeno je koliko dugo bi ona mogla bezbedno da radi sa nižim osobinama.
Lazar Radovanović (SIEMENS-Energy, Belgrade)
Abstrakt
The main value and goal of replacing coal with gas in existing power plants is the reduction, reduction of carbon dioxide emissions.
The main advantages of replacing coal with gas is the use of the existing location with as much as possible the use of the existing power plant infrastructure, and with the improvement of the plant's performance. This concept allows for rapid project implementation. As a result, higher power plants can be achieved on site and with performance very close to the performance of new plants.
Prof Vojin Grković, Prof Đorđije Dodijer (University of Novi Sad, Faculty of Technical Sciences, Novi Sad, Serbia)
Abstrakt
Power systems technology transition is defined as the process of changing the systems
technology structure until a new technology becomes dominant in the electricity generation.
Evaluation of a power system’s competitiveness in technology transition is considered. For the
competitiveness metrics is used 3ETT Indicator. General approach is demonstrated on the hypothetical
power system consisting of five different energy technologies, i.e. wind turbines, nuclear power
plants, lignite fired and hard coal fired power plants, as well as combined cycle gas turbines.
Sensitivity analysis to cost ratio changes is also performed and corresponding results are presented.
Regarding ability of a power system to change the power on demand the power system’s
competitiveness is analyzed using dispatchability and ATC Indicators. Obtained results are presented
and discussed. The results point out that better competitiveness of the power system can be reached
with technology transition from hard coal and lignite fired technologies to nuclear technology than
with the transition from hard coal and lignite-fired technologies to wind turbines technology.
Goran Stupar, Dragan Tucaković, Ognjen Stamenković (Faculty of Mechanical Engineering, University of Belgrade, Kraljice Marije 16, 11120 Belgrade 35, Serbia)
Luka Petrović, Borivoje Vujičić (М.H. Elektroprivreda Republike Srpske, 89101 Trebinje, Republika Srpska, Bosna i Hercegovina)
Žarko Novaković, Željko Milanović (Thermal power plant Ugljevik, М.H. Elektroprivreda Republike Srpske, 76330 Ugljevik, Republika Srpska, Bosna i Hercegovina)
Abstrakt
The paper presents a technical solution for modernization with the aim of increasing the efficiency of the steam boiler of TPP Ugljevik, which implies the reorganization of the combustion system. More efficient operation of the furnace can be achieved by replacing the existing burners, reducing the number of burner levels as well as the organization of tangential combustion. The flame formed in the shape of a tube around the two central combustion vortices provides a larger amount of heat transferred to the combustion furnace, less fouling of its screen walls and thus a lower average temperature of the combustion products at its outlet. As the chosen reorganization affects the increase of the temperature of the superheated steam and the decrease of the temperature of the reheated steam, it has been proposed to reduce the area of the semi-irradiated superheater and increase the area of the second stage reheater. Taking into consideration that the reorganization of the combustion system may lead to the change of the thermal load of the evaporator located in the furnace, the paper presents the work of the steam boiler operation under new operating conditions. In order to analyze the effects of modernization on the operation of the steam boiler as a whole, an estimative coupling of differential mathematical models of coal combustion processes, flow, radiation of combustion products and formation of nitrogen oxides with integral thermal calculation procedures has been performed. This calculation system enables reliable prediction of operating characteristics of the steam boiler in new operating conditions of combustion, and its application helps assess the quality of the boiler in terms of how effective, efficient, safe and environmentally friendly its operating mode is. In this way, it is possible to form a comprehensive description of the operating mode of the steam boiler. Based on the above, calculations of the steam boiler of TPP Ugljevik have been performed both for the existing and the reorganized combustion system. The presented system of boller operation calculations was verified by measurements performed on the object in question in existing operating conditions.
Ivana Todorovic, Vladimir Obradovic (INFORMATIKA a.d., Jevrejska 32, Belgrade)
Abstrakt
Informatika a.d. from Belgrade has been present in the Electric Power Industry of Serbia for more than 30 years. In that period, Informatika implemented a number of systems for the management and supervision of technological processes in thermal power plants and surface mines, using PLCs of its own production and its INFO CONTROL SCADA package. On this occasion, the improvement of the part of the coal supply management and control system in the TENT B thermal power plant will be presented. The complete system is very demanding and complex, both due to technological specifics and working conditions (continuous operation in the presence of large amounts of coal dust). The subsystem that we will present here has the task of monitoring the quantities of coal received (data from belt scales) and processing the obtained data. The system enables the creation of predefined daily reports in pdf format with hourly and cumulative data on coal supply, consumption and disposal. Data on the amount of coal are forwarded to the information system of the Thermal Power Plant and are available to all authorized users.
Jovana Petrović (PhD student, The Mihajlo Pupin Institute - Automatika, Volgina 15, 11060, Belgrade, Serbia)
Ivan Božić (Associate Professor, University of Belgrade, Faculty of Mechanical Engineering, Laboratory for research, development, testing and optimization of hydropower plants, Belgrade, Kraljice Marije 16, Belgrade 11000, Serbia)
Abstrakt
During the operation of hydro units, continuous vibration monitoring is of exceptional importance not only for checking their normal functioning but also for assessing the condition of vital parts in order to make timely decisions for their maintenance, repair and revitalization. According to the analysis of the measured vibrodiagnostic data using artificial intelligence based on artificial neural networks (ANN), it is possible to predict the future vibrational behavior of the aggregate in the short term. The paper presents the application of two ANN models for one hydraulic turbine that has been in exploitation for more than half a century. The real in situ measured data were used to validate the numerical results. The comparative analysis of the obtained results shows the possibility, purposefulness and reliability of the mentioned contemporary tools utilization.